STEMM Institute Press
Science, Technology, Engineering, Management and Medicine
Practice on Typical Quality Issue Analysis of Main Equipment and Construction of Quality Issue Database System
DOI: https://doi.org/10.62517/jes.202502424
Author(s)
Jing Yan*, Xi Yang, Jing Wang, Huijuan Li, Song Lin
Affiliation(s)
Beijing North-Star Digital Technology Co., Ltd., Beijing, China *Corresponding Author
Abstract
Equipment quality issue cases are a direct reflection of the quality of main equipment. To enhance equipment reliability, this research focuses on the characteristics of typical quality issues of main equipment in previous projects, including IGBT breakdown, power supply board failure, and central control board malfunction. It conducts an in-depth analysis of the causes and mechanisms of these quality issues. It designs and implements a typical equipment quality issues database, which realizes functions such as rapid information storage, multi-dimensional query, and statistical analysis of typical quality issues data. Furthermore, it summarizes and extracts quality control risk points in the design, production, and installation processes of converter valves, providing guidance for subsequent converter valve design, production, and installation work.
Keywords
Equipment Typical Quality Issues; Quality Issue Database System; Information Management; Equipment Supervision
References
[1] Wang T T, Wang Z A, Yao C, et al. Research on equivalent method for thermal stability test of high-voltage and large-capacity flexible DC capacitors. Power Capacitor & Reactive Power Compensation, 2025, 46(5): 85-90. [2] Zhao D S, Zhou Y, Fan Y Z, et al. Review on power supply technology of online monitoring equipment for transmission lines. Guangdong Electric Power, 2024, 37(7). [3] Wang H, Liserre M, Blaabjerg F. Toward reliable power electronics: challenges, design tools, and opportunities. IEEE Industrial Electronics Magazine, 2013, 7(2): 17-26. [4] State Grid Corporation of China DC Construction Branch. Typical Cases of Equipment Supervision. China Electric Power Press, 2017: 14-15. [5] Liu Z. Guidelines for Equipment Supervision of UHVDC Transmission Project Converter Stations - Converter Transformer. China Electric Power Press, 2017: 2-4. [6] Sun H Z, Chen L Y, Zhao H W, et al. A Remote Monitoring Method and System for Transformer Materials Based on EIP Platform. Shandong Province: CN118171801A, 2024-06-11. [7] Chen T, Zhang S B. Implementation and Application of Oilfield Equipment Supervision and Management Platform. Communications Management and Technology, 2025(4): 60-63. [8] Guo D P, Wu C R, Li X, et al. Establishing an Information Work Platform to Improve the Supervision Efficiency of Nuclear Power Equipment. Project Management, 2012(5): 62-63, 68. [9] Zhang P, Guo D P, Cai H W. Practice and Quality Problem Analysis of Equipment Supervision for Hydraulic Test of Nuclear-Class Pumps. Equipment Supervision, 2013(5): 52-54. [10] Peng Y T, Song Y, Chen H J, et al. Analysis of Sub-module Explosion Fault in Flexible DC Back-to-Back Converter Station. Hubei Electric Power, 2022, 46(3): 66-72.
Copyright @ 2020-2035 STEMM Institute Press All Rights Reserved