Practice of Risk Management and Control in Technical Transformation Project of Coal Handling System
DOI: https://doi.org/10.62517/jsse.202508104
Author(s)
Honglei Cao1,2,*, Qiang Wang2,*, Xuxing Liu2,*, Siyuan Zhang2,*, Wenjing Gong1, Chao Tang1
Affiliation(s)
1School of Management, Shandong University of Technology, Zibo, Shandong, China
2Huadian Power International Corporation Limited Zouxian Power Plant, Fuel Maintenance Branch, Jining, Shandong, China
*Corresponding Author.
Abstract
As an important auxiliary equipment of coal-fired generating units, the coal handling system has become the main means to improve the economy of coal-fired generating units and the level of energy saving and environmental protection of the coal handling system by upgrading the system or equipment technology. This paper mainly discusses how to effectively analyze, identify, manage and control the risks of safety, quality and progress in the implementation process of the technical transformation project of coal handling system, and summarizes the operational risk management and control countermeasures and concepts, in order to provide management reference for related enterprises and similar projects.
Keywords
Coal-Fired Power Generation; Coal Handling System; Technical Transformation Project; Risk Identification; Risk Management and Control
References
[1] Xu Y, Reniers G, Yang M. A multidisciplinary review into the evolution of risk concepts and their assessment methods. Processes, 2024, 12(11): 2449.
[2] E. I. Tymul. Selection of Qualitative and Quantitative Analysis Methods for Energy Enterprise Risks. Science and Technology, 2021, 20(1): 83-90.
[3] Li Y, Sankaranarayanan B, Thresh Kumar D, et al. Risks assessment in thermalpower plants using ISM methodology. Annals of Operations Research, 2019, 279(1-2): 89-113.
[4] Ou Guohai. Analysis on Key Points of Safety Production Management in Power Generation Enterprises. China Equipment Engineering, 2020 (4): 58-59.
[5] ZHang Lei-qiong, HU Bao-xiang, JIN Liang-liang. Safety management countermeasure analysis of power system. Integrated Circuit Application, 2022, 39 (5): 234-235.
[6] Kulembayeva F, Seitkaziyeva A, Yelshibayev R. Economic efficiency of outsourcing business models: A comparative assessment. Global Journal of Flexible Systems Management, 2022, 23(1): 75-88.
[7] Gong Yi. How to improve the management level of technical transformation and overhaul projects. Shandong Industrial Technology, 2014 (24): 227.
[8] Hang Dong-qiang. Preliminary Study on Management of Technical Transformation and Overhaul of Electric Power Engineering. Communication World, 2019, 26 (12): 206-207.
[9] Sun Xianjie, Wan Jingjiang. Discussion on Construction Safety Management and Control Measures of Electric Power Construction Project. Labor Protection, 2024 (12): 88-89.
[10] LI Jing. Safety Management Practice of High-risk Operation in Power Generation Enterprises. Modern Occupational Safety, 2022 (5): 19-21.
[11] Li Hao. Risk management and control principles and methods of overhaul and technical transformation. Yunnan Electric Power Industry, 2012 (4): 43-44.
[12] Xia Qiong, Zhou Guangping, Chen Xiaohui. Project Management Mode of Innovative Production Technical Transformation and Overhaul. China New Technology and New Products, 2014 (20): 155-156.
[13] Zong Nannan. Quality Management of Technical Transformation Project of Waste Incineration Power Plant. China Electric Power Enterprise Management, 2023 (18): 49.
[14] Zhang Junlong. Application of Whs Quality Control Point in Substation Engineering. China Management Informatization, 2015, 18 (12): 237-238.
[15] Ye Lijun. Study on Countermeasures for Improving Energy-saving Index of Coal Handling System in Power Plant. Electric Power Equipment Management, 2025 (2): 243-245.
[16] Ma Pengju. Analysis of Construction Safety Management of Technical Transformation Projects in Coal Chemical Enterprises. Chemical Management, 2023 (36): 109-112.
[17] Response Plan for the Whole Process of Power Plant Technical Transformation Management. China New Technology & Products, 2020, (01): 125-126.